Error message

Farr West July Up-date

Monday, July 22, 2019 - 4:00pm

Thank you to everyone who helped and participated in this year's Farr West Freedom Festival. It was a great year and the city would like to express their appreciation to all of those who helped make it happen. We couldn't do it without everyone's dedication, time, and assistance.

Upcoming CERT Training: Sept. 19th - Oct. 10th

 

2700 North Improvements Construction Information

  • Improve safety of the traveling public
  • Reduce delay along 2700 North between U.S. 89 and Farr West Elementary School
  • Improve the intersection operations at 2000 West, I-15, and U.S. 89
  • Maintain bike and pedestrian access along the corridor
  • Improving mobility for truck traffic

WHAT TO EXPECT DURING CONSTRUCTION

  • Daytime Work
  • Anticipated June through mid-July
  • Interchange and intersection widening: 7 a.m. to 5 p.m.
  • All lanes will remain open, shoulder closures will be in place
  • Nighttime Work
  • Anticipated July through October
  • Milling and paving: 8 p.m. to 5 a.m.
  • one lane in each direction will remain open

• Residents and businesses can expect congestion, construction equipment and vehicles in the area, as well as an increase in noise, dust and vibration

• Motorists can expect to travel on milled surfaces for up to 48 hours at a time.

• The contractor will assist 2000 West residents by carrying all garbage cans placed at the edge of each driveway through the construction zone.

WHAT WILL IT LOOK LIKE WHEN IT’S DONE?

• Additional westbound lane between I-15 and Farr West Elementary

• Additional eastbound lane between I-15 and Rulon White Blvd.

 • Lengthened dual left turn lane storage westbound 2700 North to southbound I-15

• Dual left turn lanes at the 2000 West intersection in the southbound to eastbound direction

• Additional eastbound and westbound lanes through the U.S. 89 intersection as well as dual left turn lanes westbound to southbound and eastbound to northbound

• Optimized signal timing to improve mobility

• Resurfaced pavement

• Updated signage

Jun- mid July Intersection widening and signal work

End of July mid oct Pavement resurfacing

The Weber County Sheriff's Office is looking for qualified citizens to assist patrol deputies in serving our community through their Volunteers In Police Service (VIPS) program.

With the mosquito season in full swing the Weber Mosquito Abatement District would like to remind you to do your part and keep family, neighbors and yourself safe, inspect your yard often and change or drain any sources of water. Sources of water may include bird baths or fountains, rain gutters, plant sources, tree holes and stumps, open trash or recycling bins, ponds, kiddie pools, pet dishes, old tires, buckets, wheel barrows & wagons, toys, neglected swimming pools or overwatered lawns and gardens. If you need additional help, contact the Weber Mosquito Abatement at mosquito@webermad.org or by phone at (801) 392-1630. Thank you.

Tags: